Carry out preparatory work.

01.06.2017 | комментариев 0 | раздел: Стены

Carry out preparatory work. First, remove the old whitewash or paint from the walls, you also need to get rid of the influx and make the notches with a hammer or ax. Stock up all the necessary inventory and study the tile for the presence of marriage. Put all the defective tiles.

Оставить комментарий

Текст сообщения:

Имя:

E-mail:

Капча загружается...