2-3 weeks.

25.05.2017 | комментариев 0 | раздел: Стены

The pace of construction of frame houses is close to perfect. For example, preparation of a panel-frame house for 120 square meters. meters at the enterprise takes only 2-3 weeks. At this time, directly on the land plot, you can fill and equip the foundation, this work will take a maximum of 4 weeks. For the installation and construction of such a house, you will need from 1 to 2 weeks. Total, it turns out 6 weeks or a month and a half. Of course, you will need the interior decoration of the house, but it can be done in bad weather or in winter, if we are talking about a summer house.