A pipe is laid in the place of the planned race.

25.05.2017 | комментариев 0 | раздел: Стены

The next problem that a potential developer is usually to be solved is how to organize a good race to the site and take excess moisture from the site. To do this, as a rule, they hire a small excavator, dig a ditch about 0 around the perimeter of the site.5 meters. A pipe is laid in the place of the planned race. The arrival and access roads to the place of planned construction is poured with any shale or crushed stone with a tram.