And 16 coal
In the territory under consideration, coal layers are timed to coincide with carbon fiber deposits and are represented by Karaganda and Ashlyarika with productive Svits containing 18 and 16 coal layers respectively from 1 to 8 m (layer K)- at present, 11 strata of the Karaganda spite of the total removable are developed by existing mines. with a capacity of about 20 m and one layer of AS Ashlyarika Svita with a capacity of 1.6-1.8 m. Coal layers A — and are planned to work in the near future.
Оставить комментарий