Angles for a
5. The monolithic foundation is obliged to “stand” at least 14 calendar days, before the start of the construction of the walls.
6. Using a reinforced mesh at all angles for a block foundation. For a monolithic — from above and below the connection of wire among themselves.
Оставить комментарий