Are made and
After mounting the lift, before direct commissioning, the design must be a technical inspection for compliance with the safety rules in order to successfully withstand the control test. This is what the relevant entries in the passport of the unit are made and in the acceptance journal. It is also necessary to inspect the lift after each worked shift, which is also being recorded in the journal. If the lift is recognized as faulty, the operation of it is strictly prohibited
Оставить комментарий