Are needed
2.A supply and exhaust design with cooling of the air influx.
It is installed if the ventilation and cooling of air are needed, this is achieved by the installation of the chief air conditioner. In this case, the air filtration will be 100 percent. Its poor quality is the need to install a large number of ducts, installation of expensive automation and freezer machine.
Оставить комментарий