At the next stage, the site is marking.

30.05.2017 | комментариев 0 | раздел: Стены

First they plan the perimeter of the future fence, determine the places where the gate and gate will be. They calculate the number of supports and profiled sheets, which can be ordered with delivery in the right amount. At the next stage, the site is marking. Install columns with the calculation of the fact that between them the intermediate distances should be no more than 3 meters. Pits are digging under them with a diameter of at least 15 cm and depth from one to one and a half meters. This can be done manually or using a manual or electric drill.