Block-modular construction: norms and requirements

31.05.2017 | комментариев 0 | раздел: Стены

The full collection of one -story or two -story building and its connection to engineering networks takes from two weeks to one month.

The basis of the block container is a metal-dried frame consisting of steel bent profiles and wooden bars attached to them. The stability of metal structures to corrosion is ensured due to the application of the anti -corrosion color coating after the completion of the manufacture of the metal frame.

Оставить комментарий

Текст сообщения:

Имя:

E-mail:

Капча загружается...