Building of the

27.03.2017 | комментариев 0 | раздел: Стены

The base is laid out of complete brick, and the multi -storey building of the house is laid out of silicate complete brick, because it holds more than the load and its brand above. When erecting a house on the 1st floor, the base can be laid out in a half brick. This will be more fully, and the walls will be in thickness about 38cm. If the construction of the house is more than two floors, then it is then necessary to lay out in two bricks, this does not need to be saved, because as the consequences will be very bad. When building a house in which there will be no basement, it will be necessary to do ventilation so that the humidity does not accumulate and for the winter this ventilation must be closed.

Оставить комментарий

Текст сообщения:

Имя:

E-mail:

Капча загружается...