Can be

23.05.2017 | комментариев 0 | раздел: Стены

Then they start an external inspection of the equipment, checking the reliability of the connections and the correctness of the power cables. The engine can be launched only after turning off all consumers who will be connected to the generator. Inspection of the equipment should be carried out before each inclusion of the unit, as well as after eight hours of continuous operation of the generator.

Оставить комментарий

Текст сообщения:

Имя:

E-mail:

Капча загружается...