Clear distance

17.04.2017 | комментариев 0 | раздел: Стены

Features of installation work of the output design

When equipping the sewage system according to the septic tank + well for filtering pipe from the house, lead to a septic tank. From the septic tank, a defended and completed stage of the first filtration of water through the pipes is allocated to the well, from where it falls into the soil. Pipes for the removal of sewer water should be laid at a depth of at least 80 cm from the plane of the earth. This kind of depth of laying a sewage pipe is needed to prevent it from freezing in winter. By mounting the pipeline, it is necessary to execute the angle of slope in the direction of runoff. What is the bias of the sewer pipe especially optimal, it will be necessary to calculate, but not less than 2 cm per meter linear pipes. On the bottom of the trenches where the pipes are put, sand is poured — this prevents the deformation of plastic during the shedding of the soil. After laying the pipe, it is also necessary to fall asleep with a sand layer, then with earth. A couple of decades ago, metal pipes were used in the sewers, for the adhesion of which welding was used. Now pipes for sewage of various diameters are made of plastic (PVC). Their satisfactory is performed by a faster, and reliable, bastard option. Sewer wiring in a private house is done using connectors, knees, adapters and tees at the junction site. In devices and pipes, specialized grooves are provided for their salivation, where sealing rings made of rubber are placed. Combining parts, sometimes they use silicone for fidelity to Pacley Flax, which can be purchased in a construction store. This option or the use of specialized reinforcement makes it possible to avoid leakage. Through a clear distance, it is recommended to install the tee connector with the output of the pipe to the plane — this provides the possibility of cleaning the drain in the pollution version.

Оставить комментарий

Текст сообщения:

Имя:

E-mail:

Капча загружается...