Construction of the

19.05.2017 | комментариев 0 | раздел: Стены

The next step will be the construction of the foundation formwork, the dimensions of which do not exceed the size of the cellar by more than 20 cm. In the process of erecting the formwork, it is allowed to use both a non -removable structure left in the monolith of the foundation, and the design of the collapsible, which in the future will need to be applied.

Оставить комментарий

Текст сообщения:

Имя:

E-mail:

Капча загружается...