Depth 1.5 m or below.
The course of work on creating the foundation of the frame house.
The construction of the frame house begins with drilling pits that are necessary for the pillars of the foundation. After marking the axis of the places of the pits are indicated by pegs, and then drilling is directly carried out. Depth 1.5 m or below. An important factor in determining the height of drilling is the level of freezing of the soil. No need to tilt the drill, but keep it strictly vertically so that the pits turn out accordingly at right angles to the surface of the earth. If the soil is clay and drilling, then it is better to work in dry weather.
Оставить комментарий