Directors are attached to it for the second.

06.06.2017 | комментариев 0 | раздел: Стены

If it is planned to plan a ceiling from drywall at two levels, then at this stage the work is marking the first level. Directors are attached to it for the second. Try to make the second level attach to the stiffeners of the first. The whole process of work is similar.

Оставить комментарий

Текст сообщения:

Имя:

E-mail:

Капча загружается...