Do not forget about sewage.

06.06.2017 | комментариев 0 | раздел: Стены

Then move to the installation of windows and doors. The house can be insulated with a layer of thermal insulation, the entire facade of the building will be plastered. Wiring is carried out along the walls. Do not forget about sewage. The rooms are plastered inside the house, the floor is aligned and the doors are installed. The last stage of the construction of the house is the installation of gas networks.

Оставить комментарий

Текст сообщения:

Имя:

E-mail:

Капча загружается...