Dry period and from

04.04.2017 | комментариев 0 | раздел: Стены

The design and construction of roads on salted soils should be preceded by laboratory analysis of soil soils should be removed from the upper horizons from a depth of 0.25-0.30 m to the dry period and from a depth of 0.5-0.6 m during the precipitation period.

Оставить комментарий

Текст сообщения:

Имя:

E-mail:

Капча загружается...