Drying requires three to seven days.

06.06.2017 | комментариев 0 | раздел: Стены

And in conclusion a few words according to the recipe.

It is necessary to work with a felt solution at a temperature of five to twenty -five degrees of heat, its viability time does not exceed two hours. Drying requires three to seven days. The consumption of the material depends on the width and depth of the seam, with its width of five millimeters, about one kilogram of the mixture will be required. Detailed information for each grout can be found in her instructions.

Оставить комментарий

Текст сообщения:

Имя:

E-mail:

Капча загружается...