During the
After installing the sealing vapor -permanent tape material, the psuls is mounted with windows with windows. Stick the tapes should be overwhelmed at the point of contact of the materials, starting on the vertical sides and ending with horizontal. Given the specifics of the requirements of standards relating to the size of the gaps, you can proceed to the installation of blocks as a whole. During installation, special attention should be paid to the ribbons that will be directly on the slopes to solve insulating functions. When installing the unit, it is necessary to take into account the thickness of the wall. If the wall is single -layer, then the required distance will be 2/3 of the wall thickness. Measurement must be made from the inside of the wall. Blocks are installed inside the heat -insulating layers if the walls are made of numerous layers of material. During the mounting process of the window block, it is necessary to take into account vertical basic facade lines in order to ensure the values of the vertical clearance of the vertical clearance in accordance with the construction standards.
Оставить комментарий