Dust from further work

25.04.2017 | комментариев 0 | раздел: Стены

The next step will be the conduct of electricity and the installation of new interior partitions. At the same stage, the tiles are laid in the bathroom, bathrooms and kitchen blocks (since the tile is easily washed and the dust from further work does not hurt it). These two processes are interconnected and pass in parallel.

Оставить комментарий

Текст сообщения:

Имя:

E-mail:

Капча загружается...