First markings are

14.04.2017 | комментариев 0 | раздел: Стены

The design of the screw racks has special fasteners, due to which there is no need to use welding when installing the fencing jumpers. The installation of the fence can conditionally be divided into four stages: first markings are applied, then the racks are installed, the fasteners are installed and the fencing flights are assembled.

Оставить комментарий

Текст сообщения:

Имя:

E-mail:

Капча загружается...