Frame of the
Despite the apparent complexity of the design, the manufacture and installation of multi -level ceilings from drywall does not cause special difficulties among specialists. The most important thing in this design is to correctly assemble the frame of the required configuration. The installation of multi-level ceilings made of drywall from the upper level begins, which is defended from the load-bearing floor panels of 10-15 cm, then the lower level is mounted. The starting profile is mounted on the walls using dowels, it is located around the perimeter, then a transverse CD profile is inserted into it so that they make a grid, while the distance between these profiles should not be more than 60 cm.
Оставить комментарий