If so, prepare them in advance.

20.06.2017 | комментариев 0 | раздел: Стены

Design the contour of the future fence using a rope and pegs.

Dig a trench for the construction of a strip foundation.

Pour a concrete mixture, wait at least a day. Trial layout without a solution of the lower row, which will allow you to calculate the number of bricks, determine whether the halves will be needed. If so, prepare them in advance.

Оставить комментарий

Текст сообщения:

Имя:

E-mail:

Капча загружается...