If the laying of
The base surface before laying the tiles should be cleaned well, and all the flaws should be aligned with a special solution. If the laying of the tiles is carried out on the concrete floor, it must have a layer for waterproofing. It does not hurt to mark the surface with a cord treated with chalk, and think through the location of all the tiles in order to avoid their unnecessary pruning.
Оставить комментарий