Incidentally, will act

17.04.2017 | комментариев 0 | раздел: Стены

To begin with, we need to level the floor, as the laminate creeps on a perfectly flat surface. For this, in the room on the floor we make a wooden crate, thoroughly setting the level. After that, the space between the lags is filled with blocks of insulation material, which, incidentally, will act as noise insulation. Lags are sewn up with chipboard sheets, sheets are attached with self -tapping screws, and their hats are recessed into the material. Next, floor tiles are laid on an even floor or laminate board creeps. It should be noted that laying the laminate should begin at a distance of 10-12 cm from the edge of the wall.