Its cost
1) Development of design documentation (Water supply, power supply, sewage, design, design project)-its cost directly depends on the difficulty of implementing the planned work and the location of the new building.
1) Development of design documentation (Water supply, power supply, sewage, design, design project)-its cost directly depends on the difficulty of implementing the planned work and the location of the new building.
Оставить комментарий