Marking.

26.06.2017 | комментариев 0 | раздел: Стены

Marking. Serving the axes of the pile field is carried out.

Score in the ground. This is the main stage of installation. Depending on the type, diameter, length and number of piles, it is either manually produced (2-4 people.), either using special equipment. With screwing, it is very important to control the horizontal and vertical levels of piles.