Network schedule: what is it and how it affects the construction
For the preparatory period, a comprehensive network work schedule for the construction of the frame of the main building was developed, which determined the deadlines and mutual linking of work: the demolition of existing buildings and the transfer of communications and railways; earthwork (layout, digging, refinement, backfill); the device of foundations for the frame of the building; the device of tunnels and sumps in the levels of the foundations of the building inside the main building; delivery and installation of structures of the frame of the building; Supply and installation of bridge cranes.