Now the work itself.

27.06.2017 | комментариев 0 | раздел: Стены

Now the work itself. First of all, window blocks are installed, and then a heater is laid, which is attached to the walls, floor and ceiling using dowels. All the stitches formed are neatly sealed using mounting foam so that cold from the street does not penetrate the room, and tape is glued to the joints between the insulation tiles.

Оставить комментарий

Текст сообщения:

Имя:

E-mail:

Капча загружается...