For the main period of the wide front of the construction of foundations with their bedding at a zero mark and black floor devices, for the installation of equipment and improving the operational control of the launch complex of the camp, a 51 technological unit was divided: from 1 to 15 — the construction part of the main building; from 16 to 30 — technological and other equipment of the main building; from 31 to 46 — construction and technological parts of facilities outside the main building.