Of the

19.05.2017 | комментариев 0 | раздел: Стены

After a time sufficient to dry the solution, the ceiling is being built, before which the preliminary waterproofing of the walls is necessary.

The frozen concrete surface is covered with bitumen, on which roofing sheets are laid. After that, the ventilation system is installed in the cellar.

Оставить комментарий

Текст сообщения:

Имя:

E-mail:

Капча загружается...