Or sand

21.04.2017 | комментариев 0 | раздел: Стены

For the entire thawed and frozen soil, it is filled with a tamped pebble or sand 2 m below the base of the foundation, while the pile of filling is arranged with a slope to the middle, where there are drainage pipes and prefabricated wells for pumping melt water.

Оставить комментарий

Текст сообщения:

Имя:

E-mail:

Капча загружается...