Pegs, with the exact
The first stage is the marking of the territory in accordance with the plan. What is necessary is accuracy and compliance with all the necessary rules. Thus, it is necessary to carefully calculate the area and make the necessary marks. In addition, special attention should be paid to the soil. This affects the time of shrinkage of the foundation and, accordingly, the duration of the entire building. This nuance is very necessary, and at the very beginning it is necessary to pay attention to this. As a result of this step, the site should be marked with pegs, with the exact calculation of future work.
Оставить комментарий