Pour the
Indicate the measurements measured by the level of heights.
To align the floor, pour the existing chips, potholes with a depth of more than 0.5 cm with a start solution.
Indicate the measurements measured by the level of heights.
To align the floor, pour the existing chips, potholes with a depth of more than 0.5 cm with a start solution.
Оставить комментарий