Preparation of the surface layer

29.06.2017 | комментариев 0 | раздел: Стены

Preparation of the surface layer

The base of the floating floor must be washed, dried and leveled to the level. The preparation stage is key and the effectiveness of the future noise insulator depends on it. The old flooring is required to be completely dismantled, and the base itself must be checked for the difference in heights and, if necessary, eliminate this defect using cement-sand mixture or self-leveling mixture.