Provided that

22.05.2017 | комментариев 0 | раздел: Стены

Consider some tips on how to fill the foundation correctly:

1. Since you fill monolithic concrete, it must be flooded right away.

2. It is delivered to the place in the Mixers machines. Provided that you have several people, you can pour the foundation in a few hours. Initially, you need to think over so that the car can drive from different sides of the building. This is required so that the concrete is poured from different places of formwork, for its further distribution throughout.