Put the second rack and tighten the eccentric.
Collect drying. First, we fix all the horizontal elements on one rack. The mesh pallets had their full-time fasteners, but they were drowned somewhere. Then, by a little simplifying the structure, we perform in the racks a hole with a diameter of 5 mm for wire ledges. Put the second rack and tighten the eccentric. A wire pipe is visible below, and behind the place where the gas pipe will pass.
Оставить комментарий