Ribbon foundation: technology and stages of installation

30.06.2017 | комментариев 0 | раздел: Стены

The strip foundation is laid on a layer of a tamped sand poured onto the bottom of the dug trench, filling it on 1/ on the sand in the trench, large stones are tightly laid, the cracks are clogged with gravel and all this is watered with a liquid cement mortar.

Оставить комментарий

Текст сообщения:

Имя:

E-mail:

Капча загружается...