Rigidity of

31.03.2017 | комментариев 0 | раздел: Стены

The next step will be the installation of racks from CW profile. The first stand is attached to the wall of the room. Next, the rest of the racks with an interval of B40 is a smog from one. This allows you to give the strength and rigidity of the constructed structure.

Оставить комментарий

Текст сообщения:

Имя:

E-mail:

Капча загружается...