Slate — insufficiently strong for this mother.

04.07.2017 | комментариев 0 | раздел: Стены

Construction and installation of a septic tank

To install a septic tank manufactured at the enterprise, dig a hole. It must be more than the capacity of the size and is placed at a distance of at least 5 m from the house for housing. So that there is no laundry of the septic tank with soil waters on the bottom of the pit put a concrete panel, to which the container is fixed with a steel cable. The distance between the plastic capacity and the walls of the pit must be filled with a mixture of sand and cement. With the independent production of a septic tank using granite, anticipthrrhea and concrete, it is necessary to perform the technology for the production of structures from reinforced concrete under the foundation. In order to do without the help of professionals, it is necessary to be guided by the tips:- Before pouring on the bottom of the foundation, pre-bound reinforcement or specialized reinforcing mesh lies- the bottom of the foundation pit is poured using concrete in terms of the ratio of 3 part of the sand and 1 part of the cement with the addition of the required amount of crushed stone (according to the production technology systems).For the walls of the septic tank, it is most beautiful to use masonry made of brick of silicate or holistic stone. Hydroine protection is supplied due to the masonry thickness not in the brick, and the use of hydroelectric plasticizing additives to concrete mixtures. The surface inside the walls is treated with moisture resistant material: liquid glass or bitumen. Sometimes in the design a sheet metal or slate is used. But the metal asks for work on welding and obeys rust during operation. Slate — insufficiently strong for this mother. The walls of the needlework septic tank can be made entirely of concrete. For the production of the system, wood formwork is placed in the pit at the required distance from the walls, which must be ideal to the maximum. Parallelly reinforcing the monolith, pour the solution between the formwork and the walls of the pit. After the solution is completely solidified, the formwork is disassembled. The placed septic tank placed should adjoin the ventilation hole for the output of methane. Ask how to perform ventilation in a private house in this note.

Оставить комментарий

Текст сообщения:

Имя:

E-mail:

Капча загружается...