Stage 1.
The main stages of the construction of frame hangars
Stage 1. The foundation is filled. As already noted earlier, the rapidly gained hangars do not require a capital «centuries -old» foundation. As a rule, a point method is used.
The main stages of the construction of frame hangars
Stage 1. The foundation is filled. As already noted earlier, the rapidly gained hangars do not require a capital «centuries -old» foundation. As a rule, a point method is used.
Оставить комментарий