Stages of building a country house: Instruction
The work procedure depends on the materials that are used in construction. Under the future house, it is first necessary to prepare the site. It is completely protected and carried out all measurements, communications and lighting. At the same time, it is necessary that the geodetic company conducts the calculations of the poor house. Then the escalator is pulled out the bottom under the foundation. Concrete with a low cement level is poured and the formwork is installed. Then they reinforce the pillows and concrete them with high -quality concrete. The pillows are thoroughly waterproofed from moisture, if bitumen material is used, you should wait for the complete drying of concrete. During this time, you can carry out all the necessary communications to the house.