22.05.2017

With additional guarantees

In addition, most real estate agencies operate in cooperation with insurance companies and try to provide their customers with additional guarantees, among which: the conclusion of the pre-insurance examination, which guarantees the buyer that after paying for the purchase, he will not have any legal

22.05.2017

Attic itself, so

In the manufacture of the stairs to the attic, pay special attention to the point of the ladder output to the attic itself, so that when lifting, do not rush into the inclined walls of the head.

22.05.2017

A construction bandage-serpent

So that the gaps between the sheets of drywall are sealed and not stand out on the surface, they are filled with putty and polished.

22.05.2017

Lighting source are cut

The holes for the lighting source are cut out with a special nozzle for a drill with a gear crown, a diameter similar to the required diameter of the hole.

22.05.2017

A flat surface

To cut drywall, it must first be laid on a flat surface, the length of which is not less than the length of the strip.

19.05.2017

Self -tapping

After which the frame profile is attached to them with self -tapping screws.

19.05.2017

In the ceiling, which

Assembling the frame and its fastening to the base is carried out using screws and dowels with a step 30-40 cm.

19.05.2017

The wooden frame

Installation of the suspension system should begin with marking.

19.05.2017

Speed ranges-for

Among other functional capabilities of screwdrivers, attention should be paid to the following: