13.04.2017

Log, timber houses, as

In addition, the technology of pile-screw foundations cannot be used on a rocky breed.

13.04.2017

Than the price

After calculating the minimum required diameter, the price of pipes for the manufacture of piles may be higher than the price of standard piles.

13.04.2017

It is desirable to

The need to use a reliable grillage connecting the piles.

13.04.2017

To easily

With free air access, the durability of wooden parts of the structure is ensured;

13.04.2017

With an

Long service life: screw piles treated with special compounds can last 100-150 years;

13.04.2017

Installation, in the

Installation requires a minimum of time and technical means, it is not necessary to attract complex equipment or equipment;

13.04.2017

No work is

Simplicity and high techniques of construction work: no work is required to prepare the base;

13.04.2017

Special additives

The possibility of manufacturing in winter: due to the need to add special additives to concrete, additional costs in connection with a decrease in labor productivity in winter, as well as a short light day, the cost of installing other types of foundations can increase markedly;

13.04.2017

Building building

In cases where other methods and technologies are unprofitable or simply impossible, the construction of a pile-screw foundation will help the developer in the construction of the planned object.


Warning: Use of undefined constant posts_per_page - assumed 'posts_per_page' (this will throw an Error in a future version of PHP) in /home/user56517/web/teplica-parnik.net/public_html/wp-content/themes/stroy/functions.php on line 245

Warning: Use of undefined constant paged - assumed 'paged' (this will throw an Error in a future version of PHP) in /home/user56517/web/teplica-parnik.net/public_html/wp-content/themes/stroy/functions.php on line 246