Log, timber houses, as
In addition, the technology of pile-screw foundations cannot be used on a rocky breed.
Than the price
After calculating the minimum required diameter, the price of pipes for the manufacture of piles may be higher than the price of standard piles.
To easily
With free air access, the durability of wooden parts of the structure is ensured;
With an
Long service life: screw piles treated with special compounds can last 100-150 years;
Installation, in the
Installation requires a minimum of time and technical means, it is not necessary to attract complex equipment or equipment;
No work is
Simplicity and high techniques of construction work: no work is required to prepare the base;
Special additives
The possibility of manufacturing in winter: due to the need to add special additives to concrete, additional costs in connection with a decrease in labor productivity in winter, as well as a short light day, the cost of installing other types of foundations can increase markedly;
Building building
In cases where other methods and technologies are unprofitable or simply impossible, the construction of a pile-screw foundation will help the developer in the construction of the planned object.
Warning: Use of undefined constant posts_per_page - assumed 'posts_per_page' (this will throw an Error in a future version of PHP) in /home/user56517/web/teplica-parnik.net/public_html/wp-content/themes/stroy/functions.php on line 245
Warning: Use of undefined constant paged - assumed 'paged' (this will throw an Error in a future version of PHP) in /home/user56517/web/teplica-parnik.net/public_html/wp-content/themes/stroy/functions.php on line 246