22.05.2017

A license of

In the second case, everything is somewhat more complicated than in the first.

22.05.2017

Of roof

The obvious benefit of stationary roof boiler houses led to the fact that the new houses are designed taking into account the built -in boiler houses, and the heating systems in favor of roof gas boiler rooms.

22.05.2017

At a small

When designing the walls, it is very important to maintain a certain restraint.

22.05.2017

The number of layers

The number of layers that are applied in the process of this very painting is of great importance in painting.

22.05.2017

The preparatory

Before painting any surface, it is necessary to carry out its preparation.

22.05.2017

Up, the surface

After the putty is completely dried up, the surface of the ceiling must be sanded.

22.05.2017

Finish putty

The finish layer of putty is applied after the starting starting is about eight hours.

22.05.2017

Its lag behind

The starting layer of putty is performed, which is 1cm.

22.05.2017

They are aligned with

Before putting the entire surface of the ceiling, the sealing of small irregularities are carried out, scattered on the surface of the ceiling.