That marking
It should be noted that marking is carried out in several stages: the marking is initially applied to the closing and corner racks. After that, places for racks, gate and gate are determined, then the marking of flight racks is placed then. The installation of racks is performed using the mounting key, a special plate-adapter of the required size is mounted on it, after which the screw stand is inserted into the key. A screw stand is installed along with the key in a place determined by marking. The rack after that is rotated clockwise so that it comes to a depth of 1.5 meters into the soil. After installing the rack, it should be closed with a plastic lid in such a way as to exclude precipitation with a hit. Fasten elements are selected depending on the material and the design of the fence. The use of fasteners greatly facilitates the installation of fencing jumpers. The final stage is the installation of span span, which can be made of wood, corrugated board, PVC, rabits and so on.
Оставить комментарий