The first tile is installed on the corner.
If it turns out that the last tile fits on the wall less than half, then, by determining the necessary measurements, the center is shifted to the required size. This center will be the starting point for future work. Next, you need to apply the ruler in the vertical plane and vertical lines are drawn down, while measuring are pre -measured levels for them. Having completed the application of vertical rows, the application of horizontal marks perform. In this case, the rails can be made by the rails nailed to the walls. Thanks to them, you can exclude the sliding of the tile down. The second stage — tile laying. Having finished the marking stage, you can start laying the tile. This work is carried out from the lower corner formed by two rails. The adhesive solution is applied with a trowel to a small area. First, the glue is smoothed out with the smooth side, then to the gear side to obtain horizontal furrows of the same size, which provide uniform gluing tiles. The first tile is installed on the corner. In this case, it is necessary to press the edges to the rails, and the tile itself to the wall. A strong pressure on the tile should be avoided, since an excess adhesive solution from under it can be squeezed out from this. To provide the same distance between tiles, experts recommend using special crosses.
Оставить комментарий