There will be no

17.05.2017 | комментариев 0 | раздел: Стены

Work on aligning the base with a dry screed does not require the use of cement and concrete. And this means that there will be no "wet" works and related time losses. The very essence of the base of the base with a dry screed is that the irregularities of the floor are covered with dry backfill, and then a dry screed from special sheet material is covered on top of it.

Оставить комментарий

Текст сообщения:

Имя:

E-mail:

Капча загружается...