This factor depends

05.04.2017 | комментариев 0 | раздел: Стены

As a rule, after the disconnection, part of the mounting foam protrudes outside the window, but do not rush to clean it — you need to wait for complete drying (usually not more than 12 hours), and then carefully cut. After the frame is fully installed, the masters begin to install the wings. Important point: when accepting the work and signing in the acceptance certificate, do not forget to check whether all window sashes are easy to open. This factor depends not so much on the quality of accessories and the window as a whole (as many think), but on the correct installation and adjustment. Professional windows will be adjusted immediately after installation, and will also certainly look at you after 10-14 days for repeated debugging.

Оставить комментарий

Текст сообщения:

Имя:

E-mail:

Капча загружается...