This is done for drying glue and ventilation.

13.07.2017 | комментариев 0 | раздел: Стены

Before starting work, it is necessary to cut to a certain length, having previously provided all the gaps (from the ceiling to the sheet and from the floor to the sheet). This is done for drying glue and ventilation. But do not forget to carry out hidden wiring before gluing drywall.

Оставить комментарий

Текст сообщения:

Имя:

E-mail:

Капча загружается...